Temporary electricity use at the construction site refers to various electrical distribution boxes installed on temporary power lines. The power source and lighting of the mechanical equipment provided must meet the safety technical specifications for temporary electricity use at the construction site, and must be removed after construction. Electrical equipment and wiring must be well insulated, joints are not allowed to be exposed. When joints are found to be bare or broken, they should be reported in time, and should not be handled without authorization to avoid electric shock. 

When using the rubber wire for the lifting basket, it should be laid overhead, and should not be used for mopping to prevent people from stepping on. When the car is rolling with water, such as the power cable of the stone grinder, the power cable should be racked up to prevent water immersion. Causing an accident. Lifting baskets must not be placed below the high-voltage line.

www.chinagondola.com