Fixed Boom BMU Construction

Fixed Boom BMU Construction

BMU is the most commonly used type of window cleaner equipment. It has a wide range of applications and can be used in general and complex building facades. According to the height of the building, the structure of the inside and roof, carrying capacity, and the effective space for the equipment to walk, different types of window cleaners are designed.

Product Details

Fixed Boom BMU Construction introduction

BMU is the most commonly used type of window cleaner equipment. It has a wide range of applications and can be used in general and complex building facades. According to the height of the building, the structure of the inside and roof, carrying capacity, and the effective space for the equipment to walk, different types of window cleaners are designed. It is necessary to consider safety, economy, and practicality. Therefore, the selection of window cleaners is closely related to the architectural design and construction.  

Fixed boom BMU Construction Technical parameters

type

rated road

Working height

Boom length

Gondola size

Base pier spacing

CWD

250kg

100-300m

5-35m

2000x650x1100mm

1.5m-5m


trolley speed

lifting speed

luffing seed

spinning speed

weight

0

8m-10m/min

5m-10m/min

5m-10m/min

3000kg-60000kg


Safety Devices

• Lower limit safety switch.

• Upper limit safety switch.

• Slewing safety switch.

• Cradle rotation safety switch.

• Approach system safety switch.

• Emergency stop switch.

• Emergency stop descent in case of power failure.

• Slack wire rope safety device.

• Overspeed safety device.

• Broken wire stop device.

• Overload control.

• Transmission Chain detector control.

• Power cable limit switch.

• End of wire rope safety switch.

Fixed Boom BMU Construction should pay attention to the following points: 

1、Consider the window cleaning machine each part weight, track weight, weight, force caused by lateral force and wind load caused by the operation of the;

2、The design of rail base should be consistent with the building module and convenient construction, set aside enough concrete pouring and vibrating space (such as pouring hole), when the high parapet shall refer to the window size and performance appropriate to enhance the height of the base track;

3、The supporting point of the track should not be too dense, spacing of not less than 1.5m, the maximum load will be considered as the simply supported beam support rail, the deflection of the rail deformation should not exceed the span of 1/500;

4、The rail anchor and connecting accessories design strength should be rated load can withstand more than 2 times, the anchor embedded parts should meet the requirements of architectural design, track, attachment and anchors should be anti rust and anti-corrosion treatment; the considering temperature changes caused by thermal expansion and contraction of the rail impact on the rail connection point and roof device the length of each track is not greater than 9m, the expansion gap is not greater than 3mm, circular turning trajectory should not be set expansion joints, and to ensure that the two rail joints staggered position above 2000mm. The temperature profiles in the area to try to use a small section of the orbit, in order to reduce the influence of temperature stress on rail connection point and the roof device;

5、The rail end shall be welded to the limit baffle, baffle thickness not less than 8mm, width of not less than the track width, height limit device should meet the requirements, generally not less than 100mm;

6、We should use the welding when the track in the base joint, should be galvanized steel lap welding a length not less than 200mm, width of not less than the track width 20mm, thickness of not less than 12mm in the bottom of the track.


Inquiry