Stamping Parts Mold Development

Stamping Parts Mold Development

Our company is specialized in custom metal stamping mold, specialized in Stainless steel materials stamping, has the rich production experience, will meet your requirements.

Product Details

Stamping parts mold development introduction

Our company is specialized in custom metal stamping mold, specialized in Stainless steel  materials stamping, has the rich production experience, will meet your requirements. we can provide low-cost, high-value delivering close-tolerance, superior quality Stamping parts mould for business partners around the country.

Our Advantage

1.Competitive price.

2.Continuance service and support.

3.Diversified rich experienced skilled workers.

4.Custom R&D program coordination.

5.Application expertise.

6.Quality,reliability and long product life.

7.Mature,perfect and excellence,but simple design.

9(001).jpg

Producing capability

1.Research and development

We have a mature technical team that can assist customers to develop new products and grow together for Stamping parts mold development.

2.Design: 

Design is available according to the samples or drawings provided Mould/Mold.

3.Customer service: 

Complete customer service support is provided , including logistics, technical services, equipment commissioning etc;

4.Processing: 

OEM manufacturing services are provided according to customer’s demand Mould.

7(001).jpg

Packing&Delivery

Packing Details:after assemble and clear mold, we paint anti-rust fog or grease on mold, then cover it with thin film and place it into a stable wooden box.

Delivery Detail:Around 30-50 days, with 1st Mold trialing report and Mold trailing samples.

FAQ

Q1. Do you making the mold and also producing?

A: Both, we making molds and also making production.

Q2. How can I get the quotation?

A: Please send us 2D/3D drawings with your request for Mold(mold cavity, mold life),  we will quote for you within 24 working hours.

Q3. I have no 3D drawing, how should I start the new project?

A: You can supply us a sample, and we will help to finish the 3D drawing design.

Q4. How long is the lead-time for mold?

A: It all depends on the mold’s size and complexity. Normally, the lead time is 25-35days. If the molds are very simple and with small size, we can work out within 15 days.

Q5. How do you ensure quality control?

A: We inspect products on every stage of production and ensure 100% output quality thorough OQC inspection before shipment.


Inquiry